Only one of the lanes will be closed. Drivers need to pay attention to signs and reduce speed. CCR ViaLagos ViaLagos, a Motiva company, accelerates another stage of the RJ-124 pavement revitalization program. This week micro-surfacing will be applied between kilometers 46 and 0, between Iguaba Grande, in the Lakes Region of Rio and Rio Bonito, in the Metropolitan Region of Rio. There will be a lane closure in the sections under intervention between 7am and 5pm. Drivers must respect the signs and reduce speed when passing through the area. Asphalt microsurfacing is a preventive conservation technique that consists of applying a thin layer of coating over the existing pavement, with the aim of restoring its functional characteristics. ? Follow the g1 Região dos Lagos channel on WhatsApp.
ViaLagos accelerates asphalt revitalization on RJ-124, from Iguaba Grande to Rio Bonito
Only one of the lanes will be closed. Drivers need to pay attention to signs and reduce speed. CCR ViaLagos ViaLagos, a Motiva company, accelerates another stage of the RJ-124 pavement revitalization program. This week...
The intervention improves vehicles' adhesion to the road, increases the waterproofing of the pavement and contributes to the safety and comfort of users, in addition to extending the useful life of the highway. Managed by ViaLagos, Rodovia dos Lagos (RJ-124) is nationally recognized for the quality of its infrastructure. According to the National Ranking of the CNT Highway Survey, the road is considered the best in the state of Rio de Janeiro and the second best in the country. 57 kilometers long, the highway connects the Metropolitan Region to the Lakes Region, being one of the main tourist routes in the state, especially during the high season. The concessionaire maintains continuous investments in conservation, recovery and modernization of the highway, with the application of high-performance technologies and materials, ensuring greater pavement durability, as well as greater safety and comfort for users. CHECK THE SCHEDULE Monday (27) Where: Km 20 to Km 14 Closure: Right lane Direction: Rio de Janeiro (South) Tuesday (28) Where: Km 3 to Km 0 Closure: Right lane Direction: Rio de Janeiro (South) Wednesday (29) Where: Km 46 to Km 40 Closure: Right lane Direction: Rio de Janeiro (South) Thursday (30) Where: Km 45 to 38 and Km 32 to 25 Interdiction: Right lane Direction: Rio de Janeiro (South) Friday (31) Where: Km 8 to Km 0 Interdiction: Right and left lane, alternately Direction: Rio de Janeiro (South)
This story was originally published by G1. Visit the original publication for further details.
Open original publication